Monday, May 20, 2019
PostQuick Computing project Essay
I designed my project on visual basics 6. 0, and the benefit I found in Visual Basics as comp bed to another(prenominal)wise software was that Visual Basics is social functionr friendly. Anyone can use it by tattleing certain adds, and on the other hand other software packages such as Microsoft Access and Microsoft Excel require a bend of knowledge before using them. To make my own project using visual basics, I for the first time designed my form on the paper, which gave me a rough idea about how my project form would reckon like.This is also attached with my documentation. I designed my project by prototyping, and make my form using these things A set of screen that shows the user what might be possible A system with limited functionality An living system that might be modified For my human-computer interface (HCI), I used graphical user port wine (GUI) which is used in Microsoft windows . My form had certain buttons which could be used by clicking the mouse and some tex tual matter boxes in which entropy was entered using keyboard.I think that the advantage of this type of interface is this that It is easy to use In my form no one needs special instruction The disadvantage of GUI is It uses a lot of processing mogul It requires good graphical display It uses a lot of processing power It uses a lot of memory and disk space 3. Method of Data Entry, including Validation As state before that my form had certain buttons and these buttons could be used by clicking the mouse and some text boxes in which selective information was entered using keyboard.I declared each(prenominal) data type with certain specific data type, and checked that if I entered wrong data type and then it would not work. The method of data founding is also shown in implementation. The computer program contains three forms. The main form, which is named input form, is the start-up form. This is the data entry form for exclusively the data, which is entered for a particular ass ignment. The method of entranceway data is as follows. Consignment No These are self-generated. Numbers, its enabled symmetry is false. User has no control on entering its data.Customer Name destination and client process get out be entered in respective columns. Afterwards the tuition of the first lot of the consignment will be filled (i. e. the whole form will be filled). If there are more then one parcel required to be entered for the same consignment then add parvenue parcel button is pressed for the parcel, and after each parcel entry of the consignment data entry finish up button will be pressed For a separate consignmentnew consignment button is required to be pressed.It was part of validation of the project that, the minimum weight of the parcel should not be slight then 1 kg. If it does then the pass along box would emerge saying that as well less weight in the parcel. Second validation was that the weight of the parcels should not exceed 30 kg, if it does then the message box would appear saying, too much weight of the parcel The third Validation was that the maximum dimension of the parcel i. e. (length + breadth + height) must not exceed 3 m, if it does then the message box would appear saying too big Parcel to send.The fourth validation was that the maximum weight of consignment must not exceed 200 kg, if it does then the message box would appear saying too much weight of the consignment 4. Record structure, deposit organisation and processing- The file for the database of the consignments for the Parcel follow is saved as a record structure and saved only for the consignments for one day. It includes the data and information required for the parcels in consignments. It is a record file so it cannot be transmitd, but the database is changed everyday because each day different consignments are sent to the Parcel Company.The database is linked with Visual basics form, and the file of database is stored as a Microsoft access file. For the backup the file is saved in the floppy so if the actual program in the central processing unit is altered, we can bring back the old one. There are four files that I used for my project one was the form file, named as input parcel, and two forms were for the price list, the Access file linked to database, named as, payslip database which has two databases linked to each other.The actual processing carried out by the program is arithmetic operation, in other words calculation is being carried out, but the bigger companies can use quantify SYSTEM, which would be more economical for them. 5. Security and integration of Data Security is the most important thing, because if your data is not secured properly from unauthorised hands then anyone could change your data and could change your project I therefore kept the project under a password So no one could change or alter my project.If someone did change my database then I could use my backup to restore it from the floppy in which Ive kept the backup file so if the actual program in the processor is altered, we can bring back the old one. I also encourageed my data, by using the add-in button in the visual basics. If you go to the text box, u click on it and then click text box protect enable force and in this way I can protect my text. I also made sure that when data is entered it is entered accurately and I checked that when I was entering data, no one enters anything. 6. System design-For documenting my project I used System prevail charts-It describes the flow of data around the system. This method uses rectangle to denote some process that takes place, as descriptive symbols to describe the remembering or input/output of data. An arrow describes the direction of flow of the data. Structure diagrams-These are a imagine of showing the design of a program or a systemic consists of charts showing the system or programs broken down into number of levels. * Hierarchy charts-these can be used to show menu power structure or a directory hierarchyData model- A data model represents the relationship amongst different parts of a database. It consists of entities (data items) and relationship. The entities are shown as rectangles and the relationship are drawn as lines that bind entities. System Flow Chart (describing the flow of data around the system) Parcelquick Company Aqsa Bano Raja 12 s Postquick Structure Diagram The hierarchy Hierarchy diagram 7. Implementation The project that I have made for PostQuick Company can be implemented either as a whole or in parts.The problem maybe that an organisation cannot change instantly to a new method of working as existing records will have to be entered into computer and this may take some time. There are two main approaches to this Implement the system department by department Dual run the new system alongside the old system The two databases below are linked to Visual basics6. 0 forms 8. Testing Length,width,height,weight Test Results Righ t/wrong.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment